contracted AG体育官方网站 Construction to repurpose the vacant 256,000-SF Caterpillar Tractor Company facility into a warehouse with distribution capabilities.
听
AG体育官方网站 Construction Company completed structural and MEP upgrades that were necessary to accommodate present-day operations for IRG. In addition to excavation, masonry and concrete work, our scope included the addition of 25 docks and created a 520-ft depressed dock on the Southeast side of the facility.
听
Additional renovations included the addition of 16 new recessed dock locations and two (2) motorized drive-in doors on the Northeast side of the facility. The exterior wall features a new brick veneer below a metal panel system, along the length of the new dock area. Site improvements at the East lot include a new dock slab on grade, removal of a guard house, retaining walls on each side of the dock slab on grade and an existing storm water line modification.
听
This completes the renovation for both the Southeast and Northeast dock installs for IRG at this facility, both completed by AG体育官方网站 Construction Company.
听