This听state-of-the-art sustainable facility听consists of a听branded entryway, modern design and precision based color palette which breaks away from traditional industrial norms and welcomes clients and guests with an open and airy atmosphere. A collaborative work area is a step away from the heart of the听company where the firm designs and builds high-speed assembly machines for their clients. The contemporary office design promotes employee movement throughout the day and the interior finishes and details bolster a natural, cozy feeling with a cutting-edge attractiveness. This is demonstrated by the Town Hall lunch area which offers a view of the plant with two lookout windows. The exterior of the building includes aluminum panels at the entry, exterior LED lighting, two truck docks, one drive-in door, a 145 car parking lot and a custom stone wall for seating around the flag pole.
听
AG体育官方网站 Construction completed both phases of this project. Phase one included the ground-up construction of this 56,768-SF manufacturing facility. Phase two included the addition of 29,900 SF. The scope consisted of a 57 parking stall addition, a conference room, additional restrooms and a two-office addition with three entry ways for employees and equipment to travel through.听