A multi-phased build-out of an existing 354,800-square-foot warehouse for a new sortation center. Building renovations include the demolition and rebuild out of a 25,900-square-foot office space, additional roof insulation to achieve R-30, the upgrade of 31 existing dock levelers from manual to hydraulic, the replacement of all current lighting with LED fixtures, new RTUs, HVLS fans, and exhaust fans, and a new main guard house. Work was concurrent with landlord addition of 36 dock locations, employee parking, and truck parking lots.
听
The second phase included the preparation of the robotic field (AR), new back-up generators for the building/material handling equipment and a remodeled prayer center with foot washing stations for both men and women.